Skip to content
Golden Roofing
Open roof deck and trusses on a new build awaiting roof installation near Myrtle Beach, SC

New Builds · Additions · Garages

Roof Installation in Myrtle Beach, SC

The first roof a structure ever wears sets how it ages. We install to the wind code this coast actually requires, on a schedule your other trades can plan around.

5.0 (3 reviews)
GAF Certified Contractor
Written Warranty Up To 25 Years
Free Roof Inspections
Locally Owned in Myrtle Beach

Starting From Bare Deck

Installing New Roofs Across Horry County

No tear-off, no surprises underneath — just a clean deck and the chance to get every detail right the first time.

A new install is the one time nobody is working around somebody else's mistakes. The sheathing is visible, the clips and fastener pattern can be checked, and the underlayment goes down over dry wood. It's also the only chance to get intake and exhaust ventilation balanced before drywall closes the attic up for the next thirty years.

Most of our installation work around Carolina Forest and the newer Conway subdivisions is additions, garages, and porch covers, plus new construction with local builders. Whatever the structure, the roof gets the same coastal detailing as a full replacement — rated shingles, proper drip edge, and a fastening layout that will pass the county's post-install check.

  • New construction roofing
  • Room addition tie-ins
  • Detached garage roofs
  • Porch and carport covers
  • Deck sheathing and clips
  • Wind-rated fastening layout
  • Balanced intake and exhaust
  • Builder schedule coordination
New roof going on a house under construction in coastal South Carolina

Where New Roofs Go Wrong

Install Mistakes That Show Up Years Later

Every one of these is invisible on handover day and expensive by year five.

  1. Skipped or Short Drip Edge

    Without it, water wicks back onto the fascia and rots the board from behind.

  2. Inland Fastening on a Coastal Roof

    Four nails where six belong passes a glance and fails the first real blow.

  3. Exhaust With No Intake

    A ridge vent with blocked soffits pulls conditioned air out of the house instead.

  4. Sealant Instead of Step Flashing

    Caulk at a wall intersection is a two-year fix on a thirty-year roof.

  5. Underlayment Laid Over Damp Deck

    Sheathing that got rained on before dry-in traps moisture under the whole system.

Install Sequence

How We Put a New Roof On

Four stages, coordinated so your framers and your inspector both stay happy.

  1. Plans and Takeoff

    We read the framing plan, calculate squares, and price the system in writing.

  2. Deck and Dry-In

    Sheathing checked, underlayment down, and the structure watertight fast.

  3. Detail Then Field

    Valleys, flashing, and penetrations first — the field shingles go over them.

  4. Vent, Inspect, Hand Over

    Ridge and soffit balanced, county inspection met, warranty documents issued.

Building on This Coast

What New Roofs Face Between Conway and the Ocean

Six things that change how a roof gets specified this close to the Atlantic.

Horry County Wind Code

Coastal zones call for rated shingles and a documented fastening schedule.

Sheathing and Clip Spacing

Panel edges need support and clips; unsupported seams telegraph through the shingles.

Racing the Afternoon Storm

Summer pop-up rain means dry-in happens the same day the deck goes down.

Coastal Fastener Selection

Salt exposure rules out the cheap galvanized fasteners used inland.

Edge Metal Under Uplift

Perimeter uplift is highest at the eave, which is where corners peel first.

Working Around Other Trades

We hold our window so framers, HVAC, and drywall keep theirs on schedule.

New Roof Work

Installation Reviews From Horry County Customers

"Replacing our roof felt like a big project, but the team made the process easy to follow. They answered our questions, walked us through the options, and the finished roof looks great."

Daniel Whitmore

"We had a leak that showed up during heavy rain, and they helped us understand where it was coming from. The estimate was clear, and getting the repair scheduled was straightforward. A good experience overall."

Jennifer Calloway

"The crew explained what needed to be fixed and kept us updated throughout the roof repair. They were respectful of our property and cleaned everything up before leaving. Really appreciated the communication."

Mark Ellison

Installation FAQs

New Roof Installation Questions

Regularly. Dry-in is on the critical path for every other trade, so we hold a firm window and hit it. Give us the framing date and we'll tell you exactly when we can be on the deck and off it.

Building Something?

Need a Roof on a New Build or Addition?

Send the plans or the square footage and we'll price the install and hold a real dry-in date.

Plan the Install

Price a New Roof Installation in Horry County

Tell us what's going up and when the deck will be ready — we'll work backwards from there.

(843) 655-2402 Fastest option — call or text for same-day service

Hours of Operation

  • Monday 9:00 AM – 8:00 PM
  • Tuesday 9:00 AM – 8:00 PM
  • Wednesday 9:00 AM – 8:00 PM
  • Thursday 9:00 AM – 8:00 PM
  • Friday 9:00 AM – 8:00 PM
  • Saturday 9:00 AM – 8:00 PM
  • Sunday 9:00 AM – 8:00 PM
Email Us Goldenroofingmb@gmail.com Second Line (843) 251-6966 — if the first line is busy

Request a Free Quote

Tell us what's going on — we'll reply fast during business hours.

Call Now